How to apply
For information and application forms, visit the council website.
Before you apply
If your project is complex, you may want to contact us to meet with our engineers, planners or other staff to discuss your design. Charges may apply.
Prepare your engineering plan
To ensure your application proceeds smoothly, you must supply the following documents when you apply to the council:
-
A copy of your approved resource consent application.
-
A plan showing your proposed water and/or wastewater network extensions or modifications.
-
Long-section engineering drawings.
-
Design compliance statements CS1/CS2 (see below).
Subdivisions of 10 lots or more, or any type of multi-storey development
In addition to documents above, you must ALSO provide:
-
New Zealand Fire Service fire risk classification.
-
Sprinkler demand calculation (if applicable).
-
Peak water demand calculation.
-
Peak wet-weather flow calculation for wastewater, including existing flows and potential future flows from upstream of the catchment.
-
Hydrant flow test results and hydrant location map.
Design compliance statements CS1 and CS2
All extensions or modifications to our water or wastewater network must comply with our engineering standards. Your application to the council must include:
Please identify any designs that do not comply with our standards. You will need to explain why they do not comply and what design solutions you propose.
We assess the designs and provide engineering input.
We will provide support and advice on using compliance statements and welcome your feedback. Phone (09) 442 2222, press 4, or email compliancestatements@water.co.nz
For more information see Compliance statements.
Approval
If your proposed network extension or modification is feasible Auckland Council will grant approval, which includes Watercare’s acceptance of the engineering plan, and any conditions.