North Harbour 2 watermain

This pipe will cater for the west and north, ensuring security of supply.

Start–finish: 2015–2026
Location: Between Titirangi and Albany
Status: Consenting

What’s happening?

We are planning to install a new pipeline from Auckland’s western water sources in the Waitakere Ranges to west Auckland, North Shore and Rodney.​

At the moment we have one pipe (North Harbour No.1) that carries water from Titirangi to the North Shore, Whangaparaoa and Orewa. It was built between 1975 and 1985 and can be difficult to repair without disrupting water supplies. 

This project is part of our wider Western Water Supply Strategy. 

What are the benefits?

The new pipe will supply enough water to meet long-term demands in the western and northern parts of Auckland, ensuring security of supply.

We can repair the old pipe without affecting the water supply.

How will this work affect you? 

Much of the work will be on the roads, and along or next to State Highway 18. 

There might be a few traffic delays when construction is underway. If we need to do any work in your property we will have already sent you a letter to let you know. 


Construction stages
We plan to begin work from around 2018, and will continue in stages until 2026.

We already have resource consents for a small section of pipe that runs next to SH18 and under the Greenhithe Bridge. This section will be built first, as the original pipe needs repairing.  

Any questions?

Please contact us:
Phone: 09 442 2222 
Email: NH2Project@water.co.nz

More information

Newsletter (March 2016)
Notice of requirement and designation process 

Northern Interceptor and North Harbour 2: application documents

Assessment of effects on environment (AEE): errata
AEE
Notices of requirement (NoR) and resource consents
NoR 1, 2 and 3: form
Lodgement letter for resource consent
AEE Vol 2 Technical Reports Part 1
AEE Vol 2 Technical Reports Part 2
AEE Vol 2 Technical Reports Part 3
AEE Vol 2 Technical Reports Part 4
Albany Reservoir
Appendix A Erosion Sediment
Appendix B Soil and Groundwater Part 1
Appendix B Soil and Groundwater Part 2
Appendix C Groundwater NH2
Appendix D Ecology
Appendix E Traffic
Appendix F Noise Vibration
Appendix G Landscape and Visual Part 1
Appendix ​G Landscape and Visual Part 2
Appendix ​G Landscape and Visual Part 3
Appendix ​G Landscape and Visual Part 4
Appendix ​G Landscape and Visual Part 5
Appendix ​H Arboriculture
Appendix ​I Archaeology
Conditions
Consent Drawings Key May 2016
Resource Consent Form
Vol 3 Consent Drawings Part 1
Vol 3 Consent Drawings Part 2
Vol 3 Consent Drawings Part 3
Vol 3 Consent Drawings Part 4
Vol 3 Consent Drawings Part 5
NoR 1 Land Requirement Plan and Property Schedule
NoR 2 Albany Reservoir Technical Comments
NoR 2 Land Requirement Plan and Property Schedule
NoR 3 Land Requirement Plan and Property Schedule​
Schedule of landowners NOR1
Schedule of landowners NOR2
Schedule of landowners NOR3​

Northern Interceptor and North Harbour 2: Application documents
Give feedback